Nadcap Implementation

TEC's Nadcap Implementation Programme provides all the necessary consulting, in-company coaching and implementation support to enable our clients to identify and correct deficiencies in existing special process controls in preparation for a successful PRI Nadcap certification audit. All of the current Nadcap special processes are covered.

We commence with a detailed review of the site operations and equipment plus an evaluation of the existing quality management system documentation and records for controlling special processes. The designated Nadcap special processes are then identified and the appropriate PRI Checklists established along with customer-specific requirements in respect of special processes.

A detailed 'gap analysis' is then undertaken using the above established requirements to identify issues and all shortcomings. The findings are analysed and a comprehensive report is prepared to act as the basis for fixing the problems in a coordinated manner to both meet the stringent requirements of Nadcap and to introduce best-practice.

A realistic action timing plan is then agreed to address all identified shortcomings - including problems uncovered with existing processing and monitoring equipment not being capable of meeting the required degree of control. A consolidation of the upgraded working practices follows that involves active guidance on how to document revised procedures/work instructions with the full involvement of staff concerned. Designated personnel are instructed in conducting product audits that cover all steps in the special process to ensure that the newly established 'best-practice' becomes 'custom-and-practice'.

Guidance is given on preparing for, and handling, the actual PRI audit which includes advice on communicating with the Nadcap auditor and the protocol for dealing with any nonconformances. Advice is also given on ongoing system maintenance and development. The Nadcap Implementation Programme concludes after PRI certification.

More details of the Nadcap Implementation Programme are available in our downloadable flyer -

A typical programme is usually phased over 2- to 3-months to allow sufficient time for the necessary actions to be accomplished and to ensure that the revised working practices are fully implemented prior to the PRI Nadcap assessment audit.

Contact us for full details, costs and availability of grant funding

Nadcap implementation programme

Nadcap implementation - shop-floor coaching 

Comprehensive preparation and implementation support to guarantee a successful Nadcap assessment by PRI to meet world-class standards with enhanced effectiveness and efficiency

Upgrading of work instructions

 Upgrading of Nadcap work instructions

Advice on how to upgrade procedures/work instructions with the full involvement of the staff concerned

Nadcap auditor training

 Training for Nadcap auditors

On-site coaching, evaluation and qualification for Nadcap auditors